What an ADU costs in the San Gabriel Valley

One published starting figure, what it covers, what it leaves out, and how to work out the number for your own lot.

The short answer

Poly Construction builds ADUs to structural shell complete from $150 per square foot of floor area. That covers the foundation, framing, roof, exterior walls, windows and exterior doors, and the plumbing, electrical and HVAC rough-in. The shell takes 50 business days once permits are issued, weekends and public holidays not counted. Interior finishes are contracted separately by the owner, and design, drawings and permitting are quoted separately. You receive a written, itemised scope before signing anything.

Shell price
From $150 per square foot of floor area
Covers
Foundation, framing, roof, exterior walls, windows and exterior doors, rough-in
Not covered
Interior finishes, contracted separately by the owner
Quoted separately
Design, construction drawings and city permitting
Shell timeline
50 business days, weekends and public holidays not counted
Before you sign
A written, itemised scope

Starting figures by size

The starting figure for the shell is the floor area multiplied by $150. These are starting figures, not quotes: the final cost depends on the size and on what we find on your lot.

Structural shell complete, floor area multiplied by $150.
Floor areaStructural shell, starting from
600 sq ft$90,000
800 sq ft$120,000
1,000 sq ft$150,000
1,200 sq ft$180,000

Not sure what size suits your lot? That is the first thing the free evaluation answers.

What the structural shell price covers

Structural shell complete, from $150 per square foot of floor area. Final cost depends on size and site conditions.
ItemIn the structural shellContracted separately by the owner
Time to structural shell complete50 business days, weekends and public holidays not countedFinishing runs after shell sign-off
FoundationIncludedNot applicable
Structural framingIncludedNot applicable
RoofIncludedNot applicable
Exterior wallsIncludedNot applicable
Windows and exterior doorsIncludedInterior doors and trim
Plumbing, electrical and HVACRough-in onlyFinish fixtures, lighting and appliances
Flooring, cabinets and countertopsNot includedOwner contracts separately
Interior paintNot includedOwner contracts separately

Design, construction drawings and city permitting are handled by us as part of the project and are quoted separately from the per square foot shell price.

What site conditions means

Final cost depends on size and site conditions. Site conditions means things like these, each from a job we have documented.

Getting into the yard

On our Rosemead job a mixer truck could not reach the back yard, so the slab was placed with a pump truck.

The Rosemead foundation →

Utility runs

On our West Covina job the utility lines were trenched underground to the new unit.

The West Covina foundation stage →

What is already there

A garage conversion keeps the existing slab and part of the structure, which is often why it costs less than a new detached unit.

Garage conversion ADUs →

How payment works

Payments are tied to completed milestones defined in your contract. You pay for work that has been done, on a schedule you agreed to before construction began. See the full process, phase by phase.

ADU cost questions

How much does an ADU cost per square foot?

Structural shell complete starts at $150 per square foot of floor area, covering the foundation, framing, roof, exterior walls, windows and exterior doors, and the plumbing, electrical and HVAC rough-in. Interior finishes are contracted separately by the owner. Final cost depends on size and site conditions.

What is not included in the $150 per square foot?

Interior finishes: flooring, cabinets, countertops, interior paint, interior doors and trim, and the finish fixtures, lighting and appliances. The owner contracts those separately. Design, construction drawings and city permitting are handled by us and quoted separately from the per square foot shell price.

How long does the structural shell take?

50 business days once permits are issued, weekends and public holidays not counted. Design and permitting come first, and how long they take varies by city.

Is a garage conversion cheaper than a new detached ADU?

Often, because the slab and some of the structure already exist. But it is not a cosmetic job: the converted space has to meet the same code as a new dwelling. Whether it is the cheaper route for you depends on what is already there.

Do I pay everything up front?

No. Payments are tied to completed milestones defined in your contract. You pay for work that has been done, on a schedule you agreed to before construction began.

Can I get a figure for my own lot?

Yes, once we have seen it. The evaluation is free: tell us the address and what you have in mind, and we will tell you what the lot can hold. You receive a written, itemised scope before signing anything.

Get the figure for your own lot

Free evaluation, no obligation. Tell us the address and we will tell you what it can hold.