Home / New Home Construction
A home built for the next generation
Building on land you've purchased or inherited, or replacing an aging house with something your family will live in for decades. This is the largest project most families ever take on, and it deserves one accountable team, not a chain of vendors.
Promotional pricingOur standard new-home offer
Structural shell complete
Starting price, by floor area
To structural shell completion
Weekends and public holidays not counted
Design, permits, construction
One contract, one point of contact
What the structural shell covers: foundation, framing, roof, exterior walls, windows and doors, and the plumbing, electrical and HVAC rough-in. Interior finishes (flooring, cabinets, paint, fixtures) are contracted separately by the owner and are not included in this price or timeline. Final cost depends on size and site conditions; you receive a written, itemized scope before signing anything.
Where projects start
Three situations we build for
Building on purchased land
You've bought the lot; now you need someone to turn it into a home. We evaluate the site, design to your family's needs, and manage everything through to move-in.
Building on inherited property
Land that's been in the family deserves a home that stays in the family. We help you understand what the lot allows and design a home that serves the generations who will use it.
Replacing an aging house
Sometimes remodeling can't fix what's wrong. A full rebuild lets you start clean: modern structure, modern systems, a layout designed for how your family actually lives.
Why one team matters here
At this scale, fragmentation is the biggest risk
On a build this size, the usual arrangement: a separate architect, a permit expediter, and a contractor, with you coordinating between them, is where money and time disappear. When drawings don't match field conditions, or plan-check corrections stall, each vendor points at the next. You're left in the middle, paying for the delay.
We run design, permitting, and construction under one roof. The people who drew your plans answer to the same team that builds them. When your city asks for corrections, we handle them directly. There's exactly one company responsible for your project, and you can reach it in Mandarin, Cantonese, or English.
What you get with the package
- Site evaluation and plain-language feasibility advice
- Architectural design and full construction drawings
- Plan-check and permits managed with your city
- Licensed construction, inspections, and utility work
- A written scope and milestone-based payments
- Regular updates and a bilingual point of contact
What the structural shell price covers, and what it does not
| Item | In the structural shell | Contracted separately by the owner |
|---|---|---|
| Time to structural shell complete | 50 business days, weekends and public holidays not counted | Finishing runs after shell sign-off |
| Foundation | Included | Not applicable |
| Structural framing | Included | Not applicable |
| Roof | Included | Not applicable |
| Exterior walls | Included | Not applicable |
| Windows and exterior doors | Included | Interior doors and trim |
| Plumbing, electrical and HVAC | Rough-in only | Finish fixtures, lighting and appliances |
| Flooring, cabinets and countertops | Not included | Owner contracts separately |
| Interior paint | Not included | Owner contracts separately |
Design, construction drawings and city permitting are handled by us as part of the project and are quoted separately from the per square foot shell price. You receive a written, itemised scope before signing anything.
Straight answers
Common questions about building new
What does a new home cost to build?
Structural shell complete starts at $150 per square foot: foundation, framing, roof, exterior walls, windows and doors, and the plumbing, electrical and HVAC rough-in. Interior finishes are contracted separately by the owner. Final cost depends on size, design, and site conditions. Before you sign anything you get a written, itemized scope, so the number you agree to is a number you understand, phase by phase.
How long does it take?
Structural shell completion takes 50 business days, weekends and public holidays not counted. Design and permitting come before that and vary by city, and interior finishing is contracted separately by the owner afterward, so the full journey from first drawings to move-in is typically a year-plus. We give you a realistic city-specific timeline up front, then report progress at every milestone so you're never guessing.
Can you also add an ADU at the same time?
Often, yes, building a new home and an ADU together can be efficient, since design and permitting overlap. We'll evaluate whether your lot supports both. More about ADUs →
What if I haven't bought the land yet?
Talk to us before you buy if you can. A short feasibility conversation about zoning, lot conditions, and utilities can save you from an expensive surprise after closing.
Tell us about your land, we'll tell you what it can hold
A free, no-obligation conversation in your language about what's realistic: options, rough costs, and honest timelines.