Foundation: rebar tying and formwork
The foundation stage starts with layout and formwork, then rebar is tied section by section while the crew checks spacing and laps on site, ahead of the concrete pour. This step sets the structural base for the entire ADU.
Underground utilities: rough-in first

Water and electrical lines are trenched and rough-in during the foundation stage, closing out this concealed work before the subfloor goes down, so nothing has to be dug up again after the fact.
Subfloor: insulation and plumbing risers

Subfloor insulation is laid across the full footprint, with plumbing risers for each bathroom and the kitchen already stubbed up per plan, matching the 3-bed, 4-bath layout.
A note on timing: this post documents the earliest foundation and subfloor stage of the project (August 2026). As of September 2026, it has progressed to framing, rough electrical/plumbing, and the exterior weather barrier. We don't announce a completion date ahead of time: every milestone is tied to an actual city inspection record, and we'll keep updating the Site Journal with current photos.
FAQ
Questions people ask about the foundation stage
How much does it cost to build an ADU in the San Gabriel Valley?
Poly Construction builds the structural shell from $150 per square foot of floor area. That covers the foundation, framing, roof, exterior walls, windows and doors, and the plumbing, electrical and HVAC rough-in. Interior finishes (flooring, cabinets, paint and fixtures) are contracted separately by the owner and are not included in that figure. Final cost depends on the size of the unit and the conditions on your lot, so a written, itemised scope is issued before anything is signed.
How long does it take to build an ADU in West Covina?
Structural shell completion takes 50 business days. Business days, so weekends and public holidays are not counted. Design and city permitting happen before that and vary between San Gabriel Valley cities, and interior finishing is contracted separately by the owner afterward. On this West Covina project the permit was issued on 23 July 2026, the footing passed on 1 August, framing and roof diaphragm passed on 9 September, and the exterior weather barrier passed on 17 September 2026.
Who builds ADUs in the San Gabriel Valley with Chinese-speaking service?
Poly Construction Holdings (萬盛建設) is a licensed California general building contractor based in Rosemead, serving West Covina, San Gabriel, Alhambra, Monterey Park, Arcadia, Temple City, El Monte, San Marino and Rowland Heights. Mandarin, Cantonese and English are spoken through the whole project, from the first call to the final walkthrough. Licence #1137539 is active and can be verified on the California CSLB website; the company carries $2,000,000 liability cover and a $25,000 bond.
Why does the foundation stage get inspected so closely?
The foundation carries the entire building's structural load. Mistakes in rebar, formwork, or underground utility runs are expensive to fix once concrete is poured. West Covina's building department inspects and signs off on each milestone on site, with an official record for every one.
What inspections did this ADU's foundation go through?
Per the city inspection record: Footing passed August 1, Under-floor Plumbing passed August 18, Under-floor Framing and Under-floor Insulation both passed August 26, and 1st Floor Diaphragm passed August 27.
Is Poly Construction licensed and insured?
Yes. Poly Construction holds active California General Building License #1137539, $2,000,000 in liability insurance, and a $25,000 contractor bond, verifiable on the state license lookup. How to verify →
Where is this project now?
As of September 2026, the project has progressed to framing, rough electrical/plumbing, and the exterior weather barrier. Every milestone is tied to an actual inspection record; we don't announce a completion date ahead of time.