Rosemead

ADU Design, Permits and Construction in Rosemead, California

We are not a contractor who occasionally works in Rosemead. Our office is here, on Mission Drive, and we have built in this city.

Building an ADU in Rosemead, in short

Poly Construction Holdings LLC is a licensed California General Building contractor (#1137539) with its office at 8808 Mission Dr, Ste 103, Rosemead. We handle the site evaluation, the construction drawings, the submission and plan check with the City of Rosemead, and the build itself. Structural shell complete starts at $150 per square foot of floor area and takes 50 business days once permits are issued. Interior finishes are contracted separately by the owner. Every conversation can happen in Mandarin, Cantonese or English.

Office
8808 Mission Dr, Ste 103, Rosemead, CA 91770
Licence
California General Building #1137539
Shell price
From $150 per square foot of floor area
Shell timeline
50 business days, weekends and public holidays not counted
Languages
Mandarin, Cantonese and English

Why a Rosemead address changes the job

A contractor based two counties away learns your city's plan check the hard way, on your project and your schedule. We submit in Rosemead regularly, our office is a short drive from most lots in the city, and a site visit does not have to be booked a week out.

It also means you can come and see us. Plenty of homeowners would rather sit across a table and look at the drawings than approve something over email, and that is easier when the office is in the same city as the house.

A finished ADU foundation slab in Rosemead, with plumbing stub-ups cast into the concrete and the perimeter formwork still in place
A Rosemead ADU foundation on the day of the pour. The capped pipes are the plumbing stub-ups, cast into the slab and impossible to move afterwards, which is why we stay on site for this one.

Watch the whole pour, step by step →

What the structural shell price covers in Rosemead

Structural shell complete, from $150 per square foot of floor area. Final cost depends on size and site conditions.
ItemIn the structural shellContracted separately by the owner
Time to structural shell complete50 business days, weekends and public holidays not countedFinishing runs after shell sign-off
FoundationIncludedNot applicable
Structural framingIncludedNot applicable
RoofIncludedNot applicable
Exterior wallsIncludedNot applicable
Windows and exterior doorsIncludedInterior doors and trim
Plumbing, electrical and HVACRough-in onlyFinish fixtures, lighting and appliances
Flooring, cabinets and countertopsNot includedOwner contracts separately
Interior paintNot includedOwner contracts separately

Design, construction drawings and City of Rosemead permitting are handled by us as part of the project and are quoted separately from the per square foot shell price. You receive a written, itemised scope before signing anything.

What we deal with, and what you deal with

California law sets the baseline for ADUs statewide, but each city applies it through its own plan check, its own corrections and its own inspections. What is allowed on your particular lot depends on the parcel, not on a general rule, so we look at it before saying anything. You deal with us. We deal with the City of Rosemead: the drawings, the submission, the corrections that come back, the permit, and the inspections through to sign-off.

Rosemead ADU questions

Do you actually build in Rosemead, or just list it?

Our office is at 8808 Mission Dr, Ste 103, Rosemead, and we have built ADUs in the city. The foundation photo on this page is from a Rosemead build.

Who handles the City of Rosemead permits?

We do. We prepare the construction drawings, submit them, answer the plan check corrections, obtain the permit and carry the project through city inspections. You are not asked to stand in line at the counter or interpret a correction letter.

What does an ADU cost in Rosemead?

Structural shell complete starts at $150 per square foot of floor area. That covers the foundation, framing, roof, exterior walls, windows and exterior doors, and the plumbing, electrical and HVAC rough-in. Interior finishes are contracted separately by the owner. Final cost depends on size and site conditions, which is why we will not quote before seeing the property.

How long does it take?

50 business days to structural shell completion once permits are issued. Business days, so weekends and public holidays are not counted. Design and city permitting happen before that and the timeline varies, and interior finishing happens after.

Can I build an ADU on my Rosemead lot?

Usually the answer is yes, but what you can build depends on your specific parcel rather than on a rule we can quote in advance. We look at the lot, check it against the current requirements, and tell you plainly what it will and will not support. That evaluation is free.

Can we do all of this in Chinese?

Yes. Mandarin, Cantonese and English, from the first site visit through the drawings, the contract, the permit questions and the final walkthrough. Not a translator brought in for a meeting, the people doing the work.

Find out what your Rosemead lot allows

Free evaluation, no obligation. Tell us the address and we will tell you what it can hold.

Request a free evaluation (626) 256-8888